The short answer
Be wary of anyone who knocks unasked with tarmac left over from another job, wants an answer today, or asks for cash. A contract agreed at your home usually comes with a 14-day right to cancel. Say no on the doorstep, and report the visit through the Citizens Advice consumer helpline.
On this page
The knock usually comes on a weekday morning. A friendly man says his crew has just finished a job round the corner, they have some tarmac left on the lorry, and he can do your drive today for a fraction of the normal price.
It sounds like luck. In a lot of cases it’s the start of a bad week. This post covers the signs to watch for, what the law says if you have already agreed, and where to report it.
Why the leftover tarmac story doesn’t add up
Hot asphalt is ordered by the tonne for a measured job. A contractor who prices properly knows roughly how much a drive will take, so a full lorry of spare material is unusual.
More to the point, a proper drive isn’t just tarmac. It needs the old surface dug out, a stone sub-base built and rolled, edging set in concrete, and a plan for where the rain goes. None of that can be done well by a crew who decided to do your drive ten minutes ago.
What you tend to get instead is a thin layer laid over whatever was there, which can break up within months.
The warning signs
Not everyone who leaflets your street is a rogue, but some patterns come up again and again.
- They knocked first. You didn’t ask anyone round, and the offer arrives with your morning post.
- The deal ends today. A price that only holds if you say yes on the spot is a pressure tactic.
- No written quote. Nothing on paper showing the area, the layers, the edging or the drainage.
- No full address. A mobile number and a first name, but no business address you can visit or check.
- Cash, now. A request for cash up front, or a trip to the bank with you in the van.
- The price grows. A low figure at the door becomes a much higher one once the work is half done.
If you see two or three of these together, the safest answer is a polite no and a closed door. Genuine firms will happily come back with a written price another day.
Your right to cancel a deal made at home
If you have already agreed, don’t panic. A contract you agree in your own home with a trader who came to you is what the law calls an off-premises contract. Under the Consumer Contracts Regulations 2013, you usually have 14 days to cancel it.
The trader has to give you information about that right, including a cancellation form, before you are bound. If they don’t, the cancellation period can be extended, by up to 12 months.
There’s one catch worth knowing. If you asked the crew to start straight away, inside the 14 days, you may have to pay for work already done when you cancel. That’s another reason never to let a doorstep crew start the same day.
Here’s how the main points compare.
| Situation | What usually applies |
|---|---|
| You agreed at home and no work has started | You can cancel within 14 days |
| You were never told about the right to cancel | The cancellation period can run on for up to 12 months |
| You asked them to start straight away | You can still cancel, but may owe for work already done |
The table is a summary, not legal advice. Citizens Advice can tell you how it applies to your case.
A worked example
Say a crew offers to “do the drive” for £1,500 cash, and you agree. A proper new tarmac drive of 36 m² tends to cost between £2,150 and £3,600, so £1,500 should already ring a bell.
Halfway through, the price becomes £4,000 because “the base was worse than we thought”. You never had a written quote, never got a cancellation form, and the crew started the same day. At that point, stop the work, pay nothing more on the spot, and call the Citizens Advice consumer helpline.
The price comparison comes from our tarmac driveway cost guide, which shows typical ranges by size.
Who to tell
In England and Wales, the Citizens Advice consumer helpline is the route to Trading Standards. If you feel threatened, or someone won’t leave, call the police.
It’s also worth telling your neighbours. Crews who work one street tend to knock on the next.
How to hire safely instead
The fix is simple, even if it takes a little longer. Get at least two written quotes from firms you contacted yourself, each showing the area, the depth of dig, the sub-base, both asphalt layers, the edging and the drainage.
Check the firm’s full name and address. Never pay the whole price before the work, and be wary of anyone who wants cash only.
If you’d rather not hunt for firms yourself, our How it works page explains how we introduce a contractor by name before passing on any of your details. When you’re ready, the form below is where to start.